1) Preheating of pipe fittings before welding: its function is to reduce the temperature difference between the weld metal and the base metal, that is, to increase the initial temperature of the welded joint, thereby reducing shrinkage stress, preventing cracks, and facilitating exhaust and slag removal. When welding important structures, thick-walled pipes, Chongqing pipe fittings with poor plasticity and strong hardening tendency, preheating should generally be carried out. The pipe is preheated locally, and its length is more than 3 times the wall thickness on both sides of the center of the weld; for pipes that tend to be hardened or prone to extension cracks, the length is more than 100mm on both sides.

2) Heat treatment after welding in Chongqing: Its function is to improve the metallographic structure of the weld, eliminate residual stress, improve the toughness of the weld, and ensure the strength. Generally, pipe fittings adopt partial post-weld heat treatment, and their length is more than 3 times the width of the weld on both sides of the center of the weld.

① Heating rate. After heating up to 300℃, the heating rate should be ≤220x25.4÷s ℃/h, and ≤220℃/h, s is the wall thickness (mm).

②Constant temperature time. The wall thickness of carbon steel is 2~2.5min per millimeter; the wall thickness of alloy steel is 3min per millimeter, and ≥30min.

③Cooling rate. The cooling rate after constant temperature should be ≤275x25.4÷s ℃/h, and ≤275℃/h; natural cooling below 300℃.

Post-weld heat treatment of pipe fittings should generally be carried out in time after welding. If there is any repair after heat treatment, it should be re-heated after repair.